Thursday, September 6, 2012

Maintaining 24/7 Water in America


From the American Water Works Association 2011

In most of our communities and cities we inherited the water infrastructure which was built by previous generations. This water storage, treatment, and distribution system delivers as much water as we want whenever we want it (under most circumstances). This amazing infrastructure to deliver 24/7 water was built beginning in the late 19th century and throughout much of the 20th century. We have barely thought twice about our water and have taken for granted the capital investment made by those previous generations. The water bill that most pay barely covers the cost of delivering the water and some repairs.  No infrastructure lasts forever and we have failed to properly maintain and plan for the orderly replacement of the water distribution systems. In the United States we have never experienced the need for pipe replacement on a large scale and have taken for granted what we were given. However, in our cities water mains are failing at an ever increasing rate.

The water distribution systems in most of our big cities have reached the end of their useful life. As documented by the U.S.Environmental Protection Agency Drinking Water Needs Survey and Assessment 2007  and the American Water Works Association, AWWA, report: “Buried No Longer:Confronting America ’s Water Infrastructure Challenge” a large proportion of US water infrastructure is approaching, or has already reached, the end of its useful life. The need to replace or rebuild the pipe networks that deliver water comes on top of other water investment needs, such as the need to replace water treatment plants, upgrade treatment technology to respond to emerging contaminants in our raw water supplies, replace storage tanks and on-going monitoring and compliance costs. The investment needs for our wastewater and stormwater systems will also have to be addressed for those systems are old as well.

According to the AWWA, restoring existing water systems as they reach the end of their useful lives and expanding them to serve a growing population will cost at least $1 trillion over the next 25 years in 2010 dollars, if we plan to maintain 24 hours per day on demand of water service for our country. The AWWA analysis includes investments that will be necessary to meet projected population growth, regional population shifts, and service area growth over that period. The EPA estimates that the twenty-year capital improvement needs for infrastructure investments necessary from 2007, through 2026, for the existing water systems to continue to provide safe drinking water to the public to be $335 billion assuming no growth in service area and no population shift. EPA’s “Clean Water and Drinking Water Infrastructure Gap Analysis,” actually estimated drinking water systems’ 20-year capital needs in the range of $204 billion to $590 billion with a point estimate of $335 billion, the always cited cost. The EPA costs exclude maintenance and replacement of dams and reservoirs because they are excluded from the EPA’s Drinking Water State Revolving Fund, DWSRF, funding. The smallest systems actually have the highest cost per person for pipe replacement because the residences are more spread out- there are more feet of pipe main per residence and the EPA’s data may be weakest in that category.

The EPA estimate for total national need of $335 billion in 2007 is comparable to the 2003 estimate of $331 billion (as adjusted to 2007 dollars). Indicating that no progress has been made in the long term replacement and during the period 2003-2007 only repairs seem to have been made.  Both the 2003 and 2007 EPA Assessments and the AWWA assessment clearly point to the nation’s water systems having entered a “rehabilitation and replacement era in which much of water utilities’ existing infrastructure has reached or is approaching the end of its useful life.” It is to be noted that no real progress has been made in water infrastructure replacement since 2007.

We are living with aging drinking water infrastructure, with increasing incidence of unplanned failures. We can continue to respond to water emergencies or, we can carefully prioritize and undertake drinking water infrastructure renewal investments to ensure that our water utilities can continue to reliably and cost-effectively support the public health, safety, and economic vitality of our communities. The choice is ours and will be made community by community. According to the EPA, water utilities in the United States is highly fragmented with approximately 52,000 water systems with 56% of that number serving populations of 500 or less. The large number of relatively small systems may not have the expertise to analyze a system and develop a replacement plan and may not have the financial capability to raise capital independently. However, smaller systems can more easily vote for capital surcharges and may be eligible under the DWSRF. The Safe Drinking Water Act, as amended in 1996, established the DWSRF to make funds available to drinking water systems to finance infrastructure improvements. The program emphasizes providing funds to small and disadvantaged communities and to programs that encourage pollution prevention as a tool for ensuring safe drinking water.

How will all this money be spent?  Transmission and distribution pipes, pumps and valves represent about 60% of the projected cost of replacement and rehabilitation. Although the least visible component of a water system, the buried pipes of a transmission and distribution network generally represent most of a system’s capital value. Even small rural systems may have several hundred miles of pipe. In larger cities, replacement or rehabilitation of even small segments of the extensive underground networks of water supply pipes can be very costly, due not only to the cost of construction but also the costs related to disruption to the city’s traffic and business. Replacement projects for water mains, valves and pumps present such challenges that they are typically only undertaken after failure driven by a utility’s need to continue providing potable water to its customers while preventing contamination of the water prior to delivery.

The rate at which water mains fail varies greatly by type of pipe, age of the pipe, water characteristics, soil characteristics, weather conditions, and construction methods. Some pipe materials have been found to degrade prematurely; galvanized pipe has turned out to be particularly susceptible to corrosion in certain soils, and unlined cast iron pipe is susceptible to internal corrosion. Asbestos cement pipe presents challenges to protect workers during pipe repairs. Currently, many water systems are using ductile iron or polyvinyl chloride pipe (PVC) for construction and replacement now. It remains to be seen how long this infrastructure will last.

The EPA estimates that 22% of the costs of water infrastructure rehabilitation will have to be spent on treatment and compliance.  Treatment facilities vary across systems depending on the quality of their source water and type of contamination present. Treatment systems can range from a simple chlorination for disinfection to a complete conventional treatment system with coagulation and flocculation, sedimentation, filtration, disinfection, laboratory facilities with computer automated monitoring and control devices. This also includes projects to remove contaminants that affect the taste, odor, and color of drinking water, but are otherwise harmless (or almost so). These costs may increase due to deterioration of source water quality.

Source water infrastructure is estimated at about 6%. This includes constructing or rehabilitating surface water intake pumps and pipes, drilled wells, and spring collectors. Drinking water comes from either ground water or surface water sources. Wells deliver groundwater. Rivers, lakes, and wells in karst terrain under the direct influence of surface water are considered surface water sources. A high-quality water supply can minimize the possibility of microbial or chemical contamination and may not require extensive treatment facilities. Many of the source water needs involve construction of new surface water intake structures or drilling new wells to obtain higher quality raw water to minimize the treatment costs.

The remaining 12% of water infrastructure needs are attributed to storage and miscellaneous other projects. Storage includes projects to construct, rehabilitate, or cover water storage tanks, but it excludes dams and raw water reservoirs because they are specifically excluded from DWSRF funding. A water utility cannot function without sufficient storage to provide adequate supplies of treated water to the public, particularly during periods of peak demand. This storage allows the systems to maintain the minimum positive pressure required throughout the distribution system to prevent the intrusion of contaminants into the (deteriorating) distribution networks which are not “water tight.”


Monday, September 3, 2012

Update on Endocrine Disruption in Water Supplies

From USGS paper cited below

Earlier this month Vicki Blazer of the U.S. Geological Survey published a new paper, “Indicators of Reproductive Edocrine Distruption in Fish in the Chesapeake Bay Watershed.” Dr. Vicki Blazer is a mairine biologist and researcher at the U.S. Geological Survey, USGS. Dr. Blazer received the American Fisheries Society 2010 Publications Award for her article investigating the mortality of fish in the Potomac River basin and is a fish biologist at the West Virginia Science Center studying the impact of contaminants of emerging concern in rivers and streams of the lifecycle and health of fish on the Chesapeake Bay and its tributaries. This paper is a summary of the most recent research (previously published) by the USGS and others on endocrine disruption in fish in the Chesapeake Bay watershed and the implications to our lives.

The Chesapeake Bay watershed feed the Chesapeake Bay, the largest and most productive estuary in the United States. It serves as a nursery ground for the fish and shellfish industry and protects the coast from storm surges and filters pollution. The estuary filters water that is carrying nutrients and contaminants from the surrounding watershed. The nutrients in proper balance bring fertility, but excess nutrient contamination to the Chesapeake Bay has caused degradation in the habitat and impact to fish and other animals. As a result, US EPA has taken control of the situation and has developed a new federally mandated TMDL (total maximum daily load) to try to restore the natural balance in the estuary by controlling nutrients in the local waters. The TMDL addresses pollution from phosphorus, nitrogen and sediment and allocates a pollution budget among the states which will decrease over time. However, according to Dr. Blazer, the fish (and other aquatic organisms) in the Chesapeake Bay watershed are being exposed to a complex mixture of chemicals that may have additive, synergistic or antagonistic effects.

In the Potomac River watershed, largemouth bass show signs of feminization (testicular oocytes and vitellogenin in males) but appear to be less sensitive than smallmouth bass to the effects of estrogenic compounds. The scientists discovered that the smallmouth bass have both a higher incidence of intersex (male fish with eggs) occurrence and a high incidence of skin lesions and large fish kills in the Potomac and James Rivers. Smallmouth bass may be the most sensitive indicator of environmental health in the Chesapeake Bay watershed. The smallmouth bass is a warning that should not be ignored, but the pollution problem they represent are beyond our understanding at this time. More work needs to be done.

Although feminization of male fish has most commonly been associated with exposure to human wastewater-treatment-plant effluent, the prevalence of male smallmouth bass with intersex characteristics is not consistently higher downstream from these point sources than upstream in the areas of the Potomac River watershed that were studied. It is not simply the residue of birth control pills in human waste. However, some additional biomarkers, such as the ratio of gonad weight to body weight and plasma vitellogenin concentrations in female bass, do appear to be adversely affected by the presence of wastewater-treatment plants upstream from the study site, but more is going on.

The sources of the endocrine-disrupting chemicals associated with intersex smallmouth bass appears to be BOTH effluent from wastewater-treatment plants and runoff from agricultural land, animal feeding operations, and urban/suburban land. All impacts of mankind. Other factors, including wastewater-treatment-plant effluent flow, number of animal feeding operations, and number of poultry houses were also associated with an increased intersex severity. Within the Potomac River basin the data showed that the higher the human population density the higher the incidence of intersex in the smallmouth bass. Also, the higher the percentage of agricultural land use density the higher incidence of intersex in smallmouth bass. The data appears to suggest beyond a certain density of agricultural land and/ or human population, the smallmouth bass population is impacted.

The USGS plans to work with the Chesapeake Bay Program to identify the chemicals that are causing the intersex, skin lesions and fish kills. The Chesapeake Bay Program intends to develop toxic contaminant reduction strategies to be added to the Chesapeake Bay TMDL by 2015. The impact on human life and the ecosystem of these and other emerging contaminants is not known, but now is the time to find out the impact from the substance we’ve been allowing to enter the waters of the earth. We need to determine the impact and fate of these micro pollutants before we implement the watershed cleanup plans to make sure we are implementing the right strategies for the health of the entire ecosystem which may include eliminating the use of certain chemicals and other actions.

Thursday, August 30, 2012

Hantavirus-Clean Up and Mouse Proof the House

Image of Deer Mouse taken from CDC 

I read in the paper the other day that seven Yosemite visitors have recently been stricken with Hantavirus. Three died. Hantaviruses are found in the droppings, urine and saliva of infected deer mice. Hantavirus pulmonary syndrome (HPS), the illness caused by the virus, can take 3 to 60 days to develop after exposure. Symptoms include fever, headache, muscle aches, vomiting and diarrhea. The syndrome is fatal in 30%-40% of all cases. There is no vaccine, treatment or cure for HPS. Hantavirus is typically transmitted by breathing in particles in the air from the droppings, urine and saliva of infected rodents. However, there have been a small number of reported cases of HPS believed to have been contracted through rodent bites. Since the virus was first identified in the United States in 1993, there have been 67 cases in California and 593 nationwide including along the Appalachian Trail possibly in Virginia. Rodents, themselves, neither get sick nor can they pass along the infection to other animals; however the Center for Disease Control, CDC, has identified the ability of Hantavirus to adapt to new rodent species. Although currently rare, HPS is potentially deadly and may be an emerging disease. Rodent control in and around the home (and Curry Village) remains the primary strategy for preventing Hantavirus infection.

Knowing about Hantavirus, I was distressed and disgusted upon returning from an extended trip in the first year we owned our home to discover mouse droppings in the pantry and utility room. My husband took care of the capture and removal and I took care of the safe cleanup and mouse proofing the house, while the cat provided monitoring, patrolling the house at night. The only comments I have on mouse capture is that peanut butter and walnuts are excellent bait for either the capture and release traps or the spring traps. It appears that mice love nuts and the ruined baking supplies provided excellent bait for my husband’s trapping. It took a while, but eventually the husband was able to rid the house of mice. Though at one point it seemed he would dump the mouse in the woods and it would sneak right back in through the gas pipe in the fireplace. Eventually, I managed to seal up all likely entries and we have been mouse free for a while, but annual maintenance is necessary to keep mice out of the house.

A mouse can fit through the narrowest gap, seemingly flattening themselves to crawl into the house. According to the Center for Disease Control a gap of a quarter of an inch or a hole the size of a pencil eraser is large enough for a mouse to enter. A systematic approach is best for sealing all entry points. First of all, there is no way to prevent mice from getting into the garage because garage doors just do not seal that tight in their tracks. Instead, it is necessary to keep all nesting material and clutter out of the garage and seal all entries to the house. If you keep your trash cans in the garage make sure that the can(s) has a tight lid and no holes in the can. The garage turned out to be an area of entry into our house. Because of a sloping lot that gives me a daylight basement, the top of the foundation is about 12 inches above the garage floor. A compressed layer of insulation had allowed the mice entry into the basement. Steel wool and lath screening was pushed into every crack, the area caulked and thanks to Larry Reed, carpenter extraordinaire, the garage was finished, trimmed and sealed. New weather stripping was placed on every exterior door. Lath screen was cut to fit around all the kitchen pipes, the dryer vent pipe, the gas pipe to the fireplace the pilot light and valve to the fireplace.  The space between the foundation and siding was carefully caulked and sealed. Attic vents were screened. Windows were caulked and weather stripping on the windows checked. All exterior  holes for electrical, plumbing, and gas lines were carefully sealed with Duxseal.

Do not sweep or vacuum up mouse urine, droppings, or nests. This will cause virus particles to go into the air, where they can be breathed in. To clean up the mouse dropping and my pantry, and utility room I first geared up. According to OSHA and the CDC if  there is not a heavy accumulation of droppings you need only  wear disposable protective clothing and gloves (neoprene, nitrile or latex-free), rubber boots and a disposable N95 respiratorto safely clean up rodent droppings. A N95 disposable respirator is just one of those white dust masks (look for the certification number and yes, I keep them in the house), I wore my rain boots and some old work cloths that I threw out afterwards. The first thing I did was throw out all the food  in the pantry and sprayed the shelf paper with disinfectant. Make sure you get the urine and droppings very wet. Let it soak for 5 minutes and then use paper towel to wipe up the urine and droppings and throw the paper towels into a plastic bag and seal carefully. I also removed the shelf paper and then cleaned the pantry again using disinfectant.

In the utility room I sprayed the floor and all flat surfaces including furnace ducts, modem shelf and top of the furnace, hot water heater and pressure tank with disinfectant, let it soak in for five minutes then used paper towels to wipe up all the droppings and then used a disposable swifter wet mop to mop the room. The basement was never cleaner. After cleanup is complete and all paper towels and swifter pads sealed in plastic bags, wash you gloved hands and boots with spray a disinfectant or a bleach solution before taking the gloves and boots off. Then throw the gloves out along with the clothes.  Wash hands with soap and warm water after taking off your gloves and take a nice hot shower before going to the store to buy new shelf paper and pantry staples. While at the store buy heavy plastic canisters to store grains, and baking supplies. 

Monday, August 27, 2012

The History of Drinking Water in Washington DC


In the first decade of the nineteenth century a group of residents of Washington DC were granted permission to pipe water from the city spring to their neighborhood in the 600 block of Pennsylvania Avenue. Shortly thereafter the city built a pipe to convey water from a city spring to the northwestern Pennsylvania Avenue vicinity, between 9th and 14th streets. These, were the first instances of water deliveries in Washington DC and the beginning of the water system in our nation’s capital. The city-wide delivery of fresh water was still another fifty years away and would arrive with the Washington Aqueduct.

The original portions of the Washington Aqueduct were planned and built by Lieutenant Montgomery C. Meigs of the Army Corp of Engineers. The Dalecarlia Reservoir was completed in 1858 and water first reached the District through the Washington Aqueduct system on January 3, 1859. Initially the reservoir provided water to the city from the adjacent Little Falls Branch, but this soon was inadequate and flow from the Potomac River was added in 1864. At that time the city government believed, the Washington Aqueduct system would be sufficient for all the future water needs of the city. Today the Washington Aqueduct is a division of the Baltimore District, U.S. Army Corps of Engineers. The Aqueduct is a federally owned and operated public water supply agency that produces an average of 180 million gallons of water per day at two treatment plants located in Washington DC and sells the water to the District of Columbia, Arlington County, Virginia, and the City of Falls Church, Virginia.

 After the initial construction of the Washington Aqueduct the surge in population of Washington DC during the Civil War, quickly created a human waste problem in the city and there were epidemics of smallpox, malaria, and typhoid from human waste contaminating the water supply which took many thousands of lives during the war years. Dr. John Snow had discovered and proved the connection between cholera and contaminated water during the 1850’s in London, England. Nonetheless, the general belief was that if water looked, tasted and smelled fine it was good and though the Potomac River provided dilution disease survived. The Washington Aqueduct was originally built as a water transportation system, to bring the river water into the city. However, in 1895 the flow from Little Falls Branch was diverted away from the Dalecarlia Reservoir to prevent disease in conjunction with development of the sanitary sewer system. Despite these steps it was clear that, the Washington Aqueduct needed to be expanded and have a filtration system. The Washington Reservoir, which is now called the McMillan Reservoir, was built in 1902 to increase supply and in 1905, a 75 million gallon per day slow-sand filtration system was added at that reservoir and the Bryant Street high-lift pumping station was built.

After World War I an 80 million gallon per day rapid-sand filter was added at the Dalecarlia Reservoir to address the problems created by continued population growth and the sheer amount of raw sewage that was being pumped into the river. Primary waste treatment began for Washington DC at Blue Plains sewage treatment plant in 1937. The continuous population growth of Washington DC during World War II made it necessary to continue to expand and improve the water supply system. In February 1946, Congress approved comprehensive plans from the Army Corp of Engineers and the City Engineer to construct, improve and add to the existing water system. For more than thirty years, implementation of the plan underwent periodic modifications through changing requirements and increases in necessary funding by Congress. This awkward and inefficient oversight and funding was still in effect when I briefly lived in the District in the early 1970s when the water and sewage agency was known as the District of Columbia Department of Environmental Services. Later, in 1985, the District Government established a new Department of Public Works, of which the Water and Sewer Administration was a part of until 1996.

In 1996, the District Government initiated the creation of the District of Columbia Water and Sewer Authority (DC WASA re-branded DC Water in 2010), an independent authority of the District of Columbia providing water delivery and sewage services to the region. On April 18, 1996, following a 30-day Congressional review period, the District Council enacted DC Law 11-111, "The Water and Sewer Authority Establishment and Department of Public Works Reorganization Act of 1996." This allowed DC WASA to have a separate and dedicated source of funding-water and sewer rates. It was envisioned that DC WASA would then be able to use that funding to meet its statutory obligation to provide sanitary sewer services and deliver potable water to the Washington Metropolitan Area. The Washington Aqueduct remains   federally owned.

Today, the Aqueduct draws water from the Potomac River at the Great Falls and Little Falls intakes and treats the water at two treatment plants, Dalecarlia and McMillan. The Aqueduct filters and disinfects water from the Potomac River to meet current safe drinking water standards. The treatment process includes sedimentation, filtration, fluoridation, pH adjustment, primary disinfection using free chlorine, secondary disinfection with chloramine through the addition of ammonia, and corrosion control with orthophosphate. The EPA sets national limits on residual disinfectant levels in drinking water to reduce the risk of exposure to disinfection byproducts formed when public water systems add chemical disinfectant for either primary or residual treatment. These levels are known as Maximum Residual Disinfectant Levels (MRDLs). The EPA also sets EPA sets limits on the contaminants regulated under the Safe Drinking Water Act to ensure that the water is safe for human consumption. These limits are known as Maximum Contaminant Levels (MCLs). During calendar year 2011, no MRDL nor any MCL violations occurred in the Washington Aqueduct system.

By 1996 some portions of the water delivery system were 100 years old and the sewage system was almost the same age. The water and sewage rates in place in the Washington Metropolitan Area covered the costs to deliver the water and treat the sewage and replace 0.33% of the system each year, an unrealistic and irresponsible repair and replacement rate.  DC Water averages between 400 and 500 water main breaks per year, and they thought that a plan to replace the system over a 300 year time span was meeting their statutory obligations. 

Water delivery systems have a long life span, they are just pipes, pumps and valves, but the life span is not infinite. We reward short sighted behavior. In order to have cheaper water and sewer, a replacement cost schedule was not built into the customer rates for the past 78 years which coincidentally is the current average age of a water main in Washington DC. There are water pipes north of the White House that are reported to have been laid before the Civil War. This past Spring DC Water announced that they have tripled the replacement rate to 1% (with of course the increase in water rates) so that in 100 years the system will be replaced. Sewage rates were increased to finance the District’s portion of the $7.8 billion Blue Plains improvement program called the Clean Rivers Project that will meet the reduced total nitrogen released requirements of their operating permits and increase the control of the system during rain storms in addition sludge treatment will be improved and sewer piping improved in many areas. In truth, according to an interview with the General Manager, George Hawkins on National Public Radio, DC Water has gotten so far behind that they cannot to catch up- it will take decades. It is likely, given the age of the water system in Washington DC the increase in replacement rate was probably necessary to address what was failing each year. One hundred years is longer than the predicated life of a water distribution system, piping systems are rated at 80 years and the average water main in Washington DC is 78 years old. The water pipes in DC are old. They leak. DC Water is trying to use a predictive modeling to determine which pipes need to replace first to keep the good quality* water they are buying from the Washington Aqueduct flowing to the homes and businesses in the District.

Washington DC (and most of America) has always thought about the cost of water wrong, there should have always been a plan for maintenance, upgrade and replacement of the system and the care and protection the water resources; instead we have all taken water (and sewage) for granted. Every pipe should have been on a schedule to be replaced before it exceeded its life and broke. The water rates need to cover these capital replacement and maintenance costs. If we do not maintain our infrastructure we will not have on demand water. DC Water sees persuading customers to pay for the maintenance and improvement of the water and sewer system as their biggest challenge. The investment into water and sewer infrastructure is simply one of the best investments that any community can make.

* Dr. Marc Edwards a professor of engineering at Virginia Tech discovered while doing research in the mid-1990s to identify the cause of an increasing incidence of pinhole leaks in copper water pipes, that chloramine was causing the accelerated pipe deterioration and extreme lead concentrations in DC drinking water. Chloramine-treated water picks up lead from pipes and solder and does not release it, resulting in elevated levels and deterioration of the pipes. The change to chloramine was made after the EPA issued regulations concerning disinfection by-products formed when chlorine reacts with organic matter in drinking water; the EPA considered these byproducts to be a potential health threat. Chloramines do not produce disinfection byproducts. The lead problem was addressed in 2004 by the Washington Aqueduct adding additional treatment steps to the water to prevent the chloramine from dissolving lead in the water mains, solder joints, and fixtures. In addition, DC WASA spent $97 million to replace a portion of 15,000 pipes and 2,000 full pipe replacements. Then after the dust settled on this re-branded themselves as DC Water. 

Thursday, August 23, 2012

EPA Rule Targeting Coal Power Plants Voided by Court

On Tuesday the U.S. Court of Appeals for the District of Columbia ruled (2-1) that the Cross State Air Pollution Rule, CSAPR, exceeded the U.S. Environmental Protection Agency’s authority by requiring some state to clean up more than their fair share of pollution. CSAPR defined each State’s emissions reduction goals and the Federal Implementation Plans to obtain those goals at the State level. However, the EPA had used computer modeling to generate emissions “budgets” for each upwind State without regard for the amount of pollution each state was contributing to a downwind problem, but based instead on the cost of remediation. The EPA was requiring the level of cleanup to be based on cost and requiring more work to be done where the cost of capturing a ton of sulfur-dioxide and nitrogen-oxide was the lowest creating a pollution trading system.

CSAPR, requiring reductions of sulfur-dioxide and nitrogen-oxide emissions in coal fired plants, was intended to have gone into effect on January 1, 2012, but the U.S. Court of Appeals District of Columbia Circuit granted a stay to the implementation of the CSAPR pending resolution of the legal challenges. Now the Court of Appeals has found the rule exceeded EPA authority. CSAPR, if it had been implemented would have reduce SO2 emissions by 73% from 2005 levels and NOx emissions by 54% at the approximately 1,000 coal fired electrical generation plants in the eastern half of the country. This rule was intended to help downwind states attain the 24-Hour and/or Annual PM2.5 National Ambient Air Quality Standards (NAAQS) and the 1997 8-Hour Ozone NAAQS. CSAPR would have replace EPA's 2005 Clean Air Interstate Rule (CAIR) which will now remain in effect. Both these rules are intended to allow states to better control their particulate pollution.

According to the Lung Association, the two biggest air pollution threats in the United States are ozone and particle pollution. Other pollutants include carbon monoxide, lead, nitrogen dioxide, sulfur dioxide and a variety of toxic substances including mercury that appear in smaller quantities. The EPA requires states to monitor air pollution under the NAAQS to assess the healthfulness of air quality and ensure that they meet minimum air quality standards. One standard of NAAQS is particulate pollution of 2.5 micrometers or less called PM2.5. Combustion engines and coal burning power plants are key contributors to PM2.5 particles, and according to the US EPA and World Health Organization, the smaller, finer pollutants measured by PM2.5 are especially dangerous for human health. Studies have shown that people are at increased risk of asthma, lung cancer, cardiovascular problems, birth defects and premature death from particles smaller than 2.5 microns in diameter that lodge deep in the lungs.

CASPR was intended to prevent pollution from one state from moving into other states and preventing them from meeting their air quality goals. Several states have been unable to meet the current particulate standard. PM2.5 particles can be either directly emitted or formed via atmospheric reactions. Primary particles are emitted from cars, trucks, and heavy equipment, as well as residential wood combustion, forest fires, and agricultural waste burning. The main components of secondary particulate matter are formed when pollutants like NOx and SO2 react in the atmosphere to form particles.

Currently, under the Clean Air Act the US EPA has established both annual and 24-hour PM2.5 air quality standards (as well as standards for other pollutants). The annual standard is 15 ug/m3 (an air quality index, AQI of 49). The 24-hr standard is 35 ug/m3 (an AQI of 99). In June of 2012 EPA announced that they are proposing stricter air quality particulate standards to go into effect in December 2012. The standard is anticipated to be 12-13 ug/m3. According to American Lung Association State of the Air Report, Pittsburgh, PA had the highest particle pollution in the nation on an annual basis. Seven cities averaged particulate levels higher than the 15 ug/m3 current standard allows: Bakersfield, CA; Hanford, CA; Los Angeles, CA; Visalia, CA; Fresno, CA; Pittsburgh, PA; and Phoenix, AZ. The American Lung Association in their latest report states that twenty cities actually have average year-round particle pollution below the current regulated level, but above the proposed EPA air quality standard of 12-13 ug/m3. The maximum 24 hour standard will remain unchanged at 35 ug/m3. While particulate pollution remains a problem the EPA has not been able to address the problem by regulation targeted at coal fired power plants.

The earth’s atmosphere is interconnected. That is accepted when it comes to carbon dioxide, but it also applies to industrial pollutants and soot. The EPA has estimated that just one-quarter of U.S. measured pollution emissions from coal-burning power plants are deposited within the contiguous U.S. The remainder enters the global cycle. Conversely, current estimates are that less than half of all measured coal pollution emissions deposited within the United States comes from American sources. According to the Mount Bachelor Observatory, Chinese exports include acid rain that falls in China, Korea, and Japan, and pollutants that enter the air stream including sulfates, NOx, black carbon, soot produced by cars, stoves, factories, and crop burning.

Monday, August 20, 2012

Recharging Groundwater

From John Hopkins University website
“The increasing use of ground water for industrial, municipal, and irrigation supply in the United States has emphasized the need for recharging the ground water in many areas by artificial means. Although the practice of artificial recharge is not widespread in the eastern half of the United States, it has been important in southern California for water conservation and flood control since about 1895.” This statement was written by David K. Todd in 1956 as the opening lines of a report titled: ANNOTATED BIBLIOGRAPHY ON ARTIFICIAL RECHARGE OF GROUND WATER THROUGH 1954.

Clearly, artificial recharge of groundwater is not a new idea and during the second half of the 20th century it became more common to use structures such as basins and pits to increase recharge or infiltration of ground water or injection of surface water into aquifers. Overdrawing the groundwater aquifers in the coastal regions of our country is most easily seen by the intrusion of salt water. Overdrawing a groundwater aquifer can have many negative impacts on the regional hydraulic balance- a reduction in discharge to surface water at some other location, an increase in recharge from surface water,  a loss of storage in the aquifer by falling water table or a loss of an aquifer by salt water intrusion or some combination of these effects. To remain a renewable resource the amount of groundwater removed from an aquifer needs to match the recharge rate. What we consume much be replaced.

As our cities have spread out the development, characterized by pavement, buildings, and other impervious surfaces prevents the infiltration of precipitation that occurred before development while the increased population increases the demand for water. Changing the recharge rate by reducing open areas or increasing water velocity through pavement can change the entire water balance and ecology of a region. In some areas of the country (and world), groundwater currently being used entered the aquifer a millennia ago when the climate in that area was wetter. That water is not being replaced under these climate conditions and the supply may ultimately be exhaused unless artificially recharged. The amount of groundwater removed from an aquifer needs to be sustainable, matching the recharge rate whether that recharge rate is natural or artificially enhanced.

These days recharge of groundwater through spreading basins, pits, and injection or drainage wells is more widely practiced and will likely increase in areas of limited rainfall. There are many challenges to recharging groundwater. The first is geologic. Except for recharge using injection wells directly into an aquifer, artificially recharged water must first move through the unsaturated zone. Characterization of the soils and geology is essential to determining the viability of an artificial recharge project. Areas where ground subsidence caused by excess withdraws of groundwater from the fine-grained compressible confining beds of sediments cannot be recharged. In addition, geological characteristics such as faults with significant offset, folds, and extensive coarse- or fine-grained sedimentary geological units can control both groundwater flow and the fate of water from artificial recharge. Groundwater is not an underground bathtub of water, the site specific geology will determine the ability to recharge the aquifer and where that recharge must take place.

Artificial recharge of a groundwater basin can be used to store surface water when supplies are plentiful as a reservoir for dry periods when water is less available. Storing the water in the underground aquifer is generally considered less environmentally damaging than dam and reservoir construction, and underground storage significantly reduces water loss from evaporation. Recharging an aquifer has lower capital costs than dam and reservoir construction, but require similar distribution networks and pumping costs tend to be higher. Monitoring water availability and allocations and water rights of overlying landowners complicate the water ownership and allocation. In California “The Water Plan” imports several million acre feet of water from northern to southern California each year. A significant portion of the imported water is stored in the groundwater aquifer by using artificial recharge, but artificial recharge is also used to stretch the water supply which could allow introduction of contaminants into the aquifer.

For 30 years Los Angeles County has recycled the water from wastewater treatments plants. This water from both secondary and tertiary treated wastewater is discharged into spreading basins to recharge groundwater. Groundwater recharge can be done by surface spreading or direct injection wells. California guidelines recommend spreading over injection because of concerns about water quality and potential health hazards. It has long been know that soil filtration improves water quality and soil column studies with secondary effluent from wastewater treatment has shown dissolved organic carbon (DOC) removal of 56% for sandy loam, 48% for sand and 44% for silty sand, with most sites removing 48% of DOC by percolation through 20 feet of soil. Greater depths of soil (80 feet) reduced DOC by 92%. This is how septic systems work and how nature filters groundwater. However, prior to discharge, wastewater is heavily chlorinated and subsequently dechlorinated, but because of high DOC concentrations in wastewater, high concentrations of disinfection by products (DBP) are created.

In 1996 the concentration of the precursors of disinfection by products such as total organic halide (TOX) and trihalomethanes (THMs) were studied in the groundwater basin and it was discovered that these precursors of disinfection byproducts in reclaimed water were not removed by percolation through the soil. Total organic halide removal was only 17%. (Fate of Disinfection By-products in the Subsurface by Colleen Rostad, U.S. Geological Survey.) The quantity and type of DBPs, varies not only by water quality and disinfection conditions, but also by properties of the organic molecules that make up the dissolved organic carbon. Studies in Los Angeles County have found that the precursors of disinfection byproducts in reclaimed water are not rapidly removed by soil percolation. As our need to recycle water expands we are potentially introducing TOX and THMs and many other contaminants into our groundwater aquifers. As coastal cities need to recycle more water and use it to recharge the groundwater aquifer to maintain the supply of available water, we need to better understand what contaminants (and emerging contaminants) are carried in the wastewater and survive soil percolation. The groundwater aquifer serves to dilute the wastewater contaminants that survive soil percolation, but we need to be honest and informed about what we are putting into or leaving in what is ultimately our drinking water supply. An interesting note is that research at Johns Hopkins University seems to indicate that groundwater recharge using soil filtration of wastewater treatment plant effluents may be an effective method of removing trace Pharmaceuticals and personal care products from the water. So recharging groundwater may be preferred over releasing effluent to rivers for downstream reuse.

Thursday, August 16, 2012

Hetch Hechy Valley Restoration Plan on Ballot for November

Picture from SF PUC web site
The Hetch Hetchy Valley is a glacier-carved granite canyon located in Yosemite National Park. Though once described by John Muir as a smaller version of the Yosemite Valley it is currently dammed and used as a reservoir and hydroelectric generator by the City of San Francisco. After obtaining more than 15,000 signatures, a group whose ultimate goal is to restore the Hetch Hetchy Valley has put an initiative on November’s ballot. The initiative would require the city to create a new master plan for their water system based on draining the reservoir and returning Hetch Hetchy to the national park service.

The initiative requires that the water plan include water recycling, water reclamation, conservation, improved storm water capture and increased development, including recharge capability, of groundwater sources and replacing the hydropower from the loss of the dam with solar and wind renewable sources of power. In addition, the plan would have to develop other sources of water supply because all the studies cited on both sides of the argument indicate that the water supply will fall short.

The Hetch Hechy system consist of much more than the reservoir created by the O’Shaughnessy Dam. The system consists of Hetch Hechy Reservoir, Cherry Reservoir and Eleanor Reservoir a portion of the New Don Pedro Reservoir as well as other small surface reservoirs of various size and significance and five groundwater basins.  The stored water in the system is transported to the cities, towns and farms supplied by the system via the Hetch Hetchy Aqueduct, the California Aqueduct, the Delta Mendota Canal, the South Bay Aqueduct, and the Pacheco Tunnel. 
Taken from BAWSCA
Now developing a plan for removing O’Shaughnessy Dam to restore Hetch Hetchy Valley is on the ballot. While many will dismiss the idea as preposterous, enough studies have been done and computer models created that it is fairly certain that the idea is only extremely costly and will reduce somewhat the reliability of the water supply. Billions upon billions of dollars depending on how certain you want your water supply to be, and remember these are costs that would have to be borne by San Francisco water rate payers not the state taxpayers or national taxpayers.

First of all, the inescapable regulatory costs- these costs are certain. While O’Shaughnessy Dam has storage capacity of 360 thousand acre-feet (taf) and the Hetch Hetchy system stores 2,000 taf of water a year, its value is more than that modest amount of water storage. The O’Shaughnessy Dam and Hetch Hechy reservoir provides water storage, hydropower generation, and some flood control, but primarily its value is that water from O’Shaughnessy Dam has filtration avoidance status. Without O’Shaughnessy Dam, the San Francisco Public Utilities System, SFPUC, would have to build a water treatment plant for filtration. New York is currently completing the construction of a new filtration facility to treat the water from the Croton Water System. Though it was originally estimated to cost $950 million, to date its cost has been $2.8 billion. This would translate to a cost of $5-$6 billion to build a filtration plant for SFPUC. Then on top of the construction costs and interest payments, there are the operating costs. Estimates have ranged from $13 million (estimated in 2000) to $20 million annually.

In addition, to replace the storage various solutions have been suggested the most obvious one being increasing the height of the Don Pedro Reservoir to increase its storage. This would require a major construction project. I could find neither feasibility studies nor estimates on the costs associated with that project- the dam cost about $100 million in 1967. Would it cost five times, ten times to expand it now? There is very little recent dam expansion or building data to use to estimate the cost.  However, to effectively replace the Hetch Hetchy storage an inter-tie linking the New Don Pedro Reservoir to the Hetch Hetchy Aqueduct would be necessary to avoid releasing the water through the Delta (and we know how that works out). It would probably cost a couple of billion or more to take care of those two items.

The ballot measure calls for including water recycling, water reclamation, and improved storm water capture in the plan. The reason is there is virtually no other way to obtain enough water for the Bay Area without it. It should be noted that at some time in the future these water reuse strategies will be necessary if the population of the Bay Area continues to grow. There are 993 miles of combined sewers in San Francisco, which collect sanitary sewage from toilets and drains in apartments, homes, schools, offices and other businesses, and street runoff throughout the city. The Water Sustainability and Environmental Restoration Plan would require rebuilding the sewer system to separate the storm water system from the sanitary sewer system and improving the water treatment and recovery of the wastewater treatment plants in San Francisco.

The two major waste water treatment plants that serve the city of San Francisco are the Southeast Water Pollution Control Plant in Bayview built in 1950’s and the Oceanside Water Pollution Control Plant built in 1993. On a dry day the San Francisco combined sewage system treats about 80,000,000 gallons a day of sanitary sewage.   The San Francisco Wastewater Treatment plants are not designed to do any more than screen out trash, skim off scum and grease and use bacterial action to digest toilet paper and bio-solids. Pharmaceuticals, pesticides, hydrocarbons and anything else the residents can think to pour down the drain or dump into the storm drains will either clog the system or be released into the Bay or Ocean. If we are to reuse this water additional treatment would be necessary. Pharmaceuticals, pesticides and other chemicals pass through the system untreated at this time additional treatment and control would be necessary to reuse this water. The cost of these systems would be dependent on the level of treatment desired to drink that water. Washington DC is currently engaged in a plan to upgrade their Blue Plains Wastewater Treatment system that discharges to the Potomac their program is estimated to cost $7.8 billion.

CALVIN (CALifornia Value Integrated Network) is an economic-engineering optimization model of California’s inter-tied water management system. It was developed by Jenkins et al. at the University of California, Davis and has been used to make many of the estimates for feasibility for removal of the O’Shaughnessy Dam and restoration of the Hetch Hetchy valley. CALVIN uses 72 years of monthly historical data to represent future hydrology. They use data from water year 1922 to water year 1993. This period includes the droughts of, 1929-1934, 1976-1977, and 1987-1992, which were some of the worst on record. However, this period of time may not be representative of the severity and duration of droughts and what rainfall will look like in the next decades. Australia’s experience with drought duration last decade should have taught us that.  The driest year in the data was 1924 when the state average rainfall was only 10.50 inches, but in that year the San Francisco Bay region was drier than the rest of the state. The future might hold a worse or longer drought or a regional drought.

An important limitation with CALVIN is perfect foresight; CALVIN knows when the droughts are going to happen and how long the droughts will be. This allows the model to be proactive in preparation for droughts, reducing water scarcity and associated costs. In addition, the model assumes that unlimited amounts of water can be purchased from others (farmers) to make up any shortfall and that there exists a pipe linking the New Don Pedro Reservoir to the Hetch Hetchy Aquitard.

This ballot measure is for the development of the Water Sustainability and Environmental Restoration Plan. This plan has the potential to be forward looking and develop an integrated and robust design for the water and wastewater systems of the Bay Area for the next century. The cost of developing this plan is limited to 0.5% of funds previously authorized by voters for the Water System Improvement Program, WSIP. That translates to $23 million dollars of the $4.6 billion WSIP just to develop a plan that must be completed by November 2015 “in time for the San Francisco Board of Supervisors or a group of citizens to propose a charter amendment to be voted on at the November 2016 election, which if passed would authorize implementation of the plan.”

Even this ballot measure is a significant decision for the residents of San Francisco, and about much more than restoring the Hetch Hetchy Valley. This is a first step on the road towards rebuilding the entire, water storage, treatment and sewer system for the Bay Area  as well as replacing the hydroelectric power from O’Shaughnessy Dam with other (hopefully) renewable power. The full implementation of the plan could easily cost San Francisco rate payers $10-$20 billion for infrastructure. I assume that funds to restore the Hetch Hetchy Valley would come from donations or the federal park service. The $23 million that the ballot measure authorizes for the study may not be enough to develop a fully integrated and workable plan, for transport, sewers, water treatment, water recycling and power generation let alone hold the necessary public hearings and outreach in San Francisco.